62 | September 2025 | www.industrialoutlook.in
P R
RESS ELEASE
GH2 SOLAR ANNOUNCES ₹400 CRORE GREEN
HYDROGEN ELECTROLYZER MANUFACTURING FACILITY IN
JOINT VENTURE WITH KOREA-BASED AHES LTD
GH2 Solar Limited, a next
generation
renewable
energy
company and one of only five
companies in India Government’s
PLI scheme for both green hydro-
gen production and electrolyser
manufacturing, announced a major
milestone
under
India’s
Green
Hydrogen Mission its upcoming
state-of-the-art
Green
Hydrogen
Electrolyzer Manufacturing Facility
in Gwalior, Madhya Pradesh, in
joint
venture
with
South Ko-
rea-based Advanced Hydrogen En-
ergy Solutions (AHES) Ltd.
The facility located in Pipersewa,
Morena district (Madhya Pradesh),
will begin with an annual manufac-
turing capacity of 105 MW awarded
under SECI’s SIGHT program,
supported by ₹157.5 crore Produc-
tion Linked Incentive (PLI) subsidy.
The total investment in the project
is approximately ₹400 crore, with
₹100 crore allocated in the first
phase to set up a 3 GWh BESS
assembly line, and the remaining
₹300 crore to be invested in phases
by 2030 to expand the facility. GH2
Solar has also outlined plans to
expand the electrolyser capacity to
500 MW by 2030, directly contrib-
uting to the National Green Hydro-
gen Mission’s target of producing 5
million tonnes of green hydrogen
annually by 2030. The announce-
ment was marked by a Bhoomi
Pujan ceremony in Gwalior, graced
by Shri Dr. Mohan Yadav Ji,
Hon’ble Chief Minister of Madhya
Pradesh. The project was formally
announced by Mr. Anuraj Jain, CEO
and Founder of GH2 solar, along-
side Prof. Joong-Hee Lee, CEO of
AHES Ltd and Mr. Raj Sharma,
Director of Rhizome Energy, UK,
both key international partners of
GH2
Solar’s
green
hydrogen
journey.
Through the JV with AHES Ltd,
GH2 Solar will bring advanced
alkaline electrolyzer technology to
India, with future expansion into
PEM and other generation systems.
In addition, GH2 Solar’s partner-
ship with Rhizome Energy (UK)
will
embed
sustainable
design
principles and advanced engineer-
ing practices, to ensure the facility
is competitive, efficient and manu-
factures tailored solutions as per
● The upcoming facility in Gwalior, Madhya Pradesh, will have an annual capacity of producing 105MW of electrolysers,
with a roadmap to scale up to 500 MW by 2030, contributing direction to the National Green Hydrogen Mission.
● Supported by ₹157.5 crore Production Linked Incentive (PLI) subsidy, the project stems from a landmark MoU
between GH2 Solar and AHES Ltd. It will be backed by GH2 Solar’s UK based partner Rhizome Energy.
● ₹400 crore of total investment, with ₹100 crore allocated in the first phase to set up up a 3 GWh BESS assembly line,
and the remaining ₹300 crore to be invested in phases by 2030 to expand the facility
● The facility is expected to create 300+ direct jobs in the clean energy sector.
● Supported by Invest India and Skill council for Green Jobs to build renewable energy capabilities and train future
workforce in line with the Government of India’s Atmanirbhar Bharat Mission